Delta Concourse A Office Support and Ergo Room Renovations


Delta Concourse A Office Support and Ergo Room Renovations

Atlanta, Georgia

 

PROJECT SCOPE:  ME^3 provided mechanical, electrical engineering services for renovating approximately 5,900 square feet of existing office space. 


DESIGN SCOPE: Phase 1 included demolition and preparation of an existing office space area to be enlarged. A bid room was also added within an existing break room to support (7) computers. Phase 2 included demolition and preparation of an existing office space for a New ERGO room. 

2015 - 2016             

Delta RFID Baggage Handling System Deployment


Delta RFID Baggage Handling System Deployment

Atlanta, Georgia

 

PROJECT SCOPE:  ME^3 served as the Lead Electrical Engineer and provided electrical engineering services to install the power distribution and data infrastructure for the installation of (42) RFID Passive Readers and Antennas for baggage claim systems in South Terminal, Concourse E, and Concourse F at Hartsfield-Jackson Atlanta International Airport

2013 - 2014             

Delta Concourse C North Infrastructure Expansion


Delta Concourse C North Infrastructure Expansion

Atlanta, Georgia

  

PROJECT SCOPE:  ME^3 provided mechanical, electrical, plumbing, and structural engineering services for a design-build project to install 


DESIGN SCOPE: 16 qty Potable Water cabinets , 16 qty Jet bridge PCs, 16 qty RIDS, 16 qty Aircraft Docking Guidance Units 



2014           

Central Passenger Terminal Complex (CPTC)

Central Passenger Terminal Complex (CPTC)
Hartsfield-Jackson International Airport - Atlanta, Georgia

PROJECT SCOPE:Comprehensive Facility Condition Assessment.

DESIGN SCOPE: Conduct a full comprehensive facility audit within the Central Passenger Terminal Complex at Hartsfield-Jackson Atlanta International Airport. This audit shall contain narratives, tables, charts, photographs, drawings and financial analyses to determine current condition, life expectancy and replacement plan of all major facility systems for the Plumbing, Fire Protection, HVAC, Electrical Power, Electrical Lighting, Electrical Signal, Utilities and Controls systems.



2011 - 2012            

Delta RFID Baggage Handling System Deployment


Delta RFID Baggage Handling System Deployment

Atlanta, Georgia

  

PROJECT SCOPE:  ME^3 provided lead electrical engineering services to install the power distribution and data infrastructure for ticket podiums at 72 terminal gates and boarding bridges located at Concourses T, A, B, and D at Hartsfield-Jackson Atlanta International Airport.


2012           

BOS Fuel Fuel Facility

BOS Fuel Fuel Facility
Logan International Airport
Boston, MA 02128


PROJECT SCOPE:Evaluation of existing problems.

DESIGN SCOPE: Perform a site visit to evaluate the water infiltration problems with the vaults and pits and prepare a summary report of the findings with recommended methods of repair and budgetary costs of the repairs.


2011             

City Fuel Farm Generator Addition

Allied Aviation Fueling of Atlanta, Inc.
3400 North Loop Road
Atlanta, Georgia 30320

PROJECT SCOPE
: Develop plans and specifications for the addition of the new generator and modifications of the existing generator including electrical, civil, and structural disciplines.

ELECTRICAL DESIGN SCOPE
: Lead electrical engineer responsible for electrical design, CADD and specifications of power distribution single lines, riser diagrams, panelboard schedules, wire and conduit schedule, power plans, lighting plans, grounding and lightning protection, telecommunication plan, and fire alarm system.




2009             

Gateway Automated People Mover Station 

Gateway Automated People Mover Station
Hartsfield-Jackson International Airport - Atlanta, Georgia

PROJECT SCOPE: A new people mover station at Hartsfield - Jackson International Airport.

ELECTRICAL DESIGN SCOPE: Provided general electrical engineering services.













2009             

Concourse E Substation 6 Breaker Coordination Study

Concourse E Substation 6 Breaker Coordination Study
Hartsfield-Jackson International Airport - Atlanta, Georgia

PROJECT SCOPE:Circuit breaker coordination study

ELECTRICAL DESIGN SCOPE:  Performed a circuit breaker coordination study using SKM software to determine why an 800A substation circuit breaker used for temporary construction power was continuously tripping.  The long term, short term, and ground fault trip settings of the breakers used in this system were adjusted as a result of our study



2008- 2010             

Concourse F 

Maynard H. Jackson International Terminal
Hartsfield-Jackson International Airport - Atlanta, Georgia

PROJECT SCOPE: Minor building modifications.

ELECTRICAL DESIGN SCOPE: Level One (1) is proposed to accommodate the Automated Guide way Transit System (AGTS) extension and passenger station, test track extension, additional ancillary maintenance and storage facility, airport support areas and Georgia Power support. Level Two (2) shall accommodate the arriving passengers, Customs and Border Protection (CBP) processing areas and support offices, and concessions.  Level Three (3) is apron level with baggage system and support areas. At this level, a pedestrian bridge from the Parking Structure connects to the Terminal.  Level Four (4) accommodates the passenger departure, ticketing processing, security check point, departure gate hold rooms, and concessions.  Level Five (5) is proposed to accommodate the airline clubs and the rooftop mechanical equipment

2007          

Concourse “C” North Passenger Boarding Bridges (Package 1)
Hartsfield-Jackson Atlanta International Airport

6000 North Terminal Parkway Suite 4000
Atlanta, GA 30320

PROJECT SCOPE: Renovation of (11) existing gates, addition of (9) new gates and expansion of Concourse C North apron and boarding levels a total of 12,000 sq. ft.

ELECTRICAL DESIGN SCOPE: Lead electrical engineer responsible for electrical design, CADD and specifications of power distribution single lines, riser diagrams, panelboard schedules, wire and conduit schedule, power plans, lighting plans, grounding and lightning protection, telecommunication plan, and fire alarm system.

2007              

SWA Tank Farm Development - BWI Tank Farm Build Out

SWA Tank Farm Development - BWI Tank Farm Build Out
Baltimore Washington International Airport - Baltimore, Maryland

PROJECT SCOPE: Design-Build project and consisted of a new jet fuel storage tank farm.

ELECTRICAL DESIGN SCOPE:(4) 30,000 bbl tanks, (5) 200HP variable frequency drive operated hydrant pumps, truck loading and off loading facilities, and a maintenance/operations building.  

2007

Concourse “C” North Passenger Boarding Bridges (Package 2) 
Hartsfield-Jackson Atlanta International Airport

6000 North Terminal Parkway Suite 4000
Atlanta, GA 30320

PROJECT SCOPE: Renovation of (11) existing gates, addition of (9) new gates, and expansion of Concourse C North apron and boarding levels a total of 12,000 sq ft.

ELECTRICAL DESIGN SCOPE: Lead electrical engineer responsible for electrical design, CADD and specifications of power distribution single lines, riser diagrams, panelboard schedules, wire and conduit schedule, power plans, lighting plans, grounding and lightning protection, telecommunication plan, and fire alarm system.

Main Power Feed: (3) 1200A and (1) 600A switchboards

2007

CLT Fuel System Improvements
Charlotte/Douglas International Airport

5501 Josh Birmingham Parkway
Charlotte, NC 28208

PROJECT SCOPE: Design modification to a jet fuel storage tank farm for two new 30,000bbl, future hydrant pump relocation, and new oil/water separation

ELECTRICAL DESIGN SCOPE: Lead electrical engineer responsible for electrical design, CADD and specifications of power distribution single lines, riser diagrams, panelboard schedules, wire and conduit schedule, power plans, lighting plans, grounding and lightning protection, telecommunication plan, plc controls diagram and EFSO/fire alarm system

2006

SWA Tank Farm Development – BWI Tank Farm Buildout 
Baltimore Washington International Airport

Aviation Blvd & Elm Rd
Baltimore, MD 21240

PROJECT SCOPE: Design a new jet fuel storage tank farm with four 30,000 bbl tanks, (5) 200HP variable frequency drive operated hydrant pumps, truck loading and off loading facilities and maintenance and operations building.

ELECTRICAL DESIGN SCOPE: Lead electrical engineer responsible for electrical design, CADD and specifications of power distribution single lines, riser diagrams, panelboard schedules, wire and conduit schedule, power plans, lighting plans, grounding and lightning protection, telecommunication plan, plc controls diagram and EFSO/fire alarm system

Main Power Feed: 2000A, 270/480V, 3Φ, 4w, 65kAIC MCC
Emergency Power – 900 kW, 270/480V, 3Φ, 4w standby generator
Variable Frequency drives for 200hp hydrant pumps.