Federal Government


2014           

Charleston Air Force Base

Fuel Storage & Distribution Facility
Charleston AFB, South Carolina

PROJECT SCOPE:Replace Fuel Storage & Distribution Facility.

DESIGN SCOPE:Provide one (1) new 80,000 barrel (bbl) storage tank, two (2) new 20,000 bbl storage tanks, a new pump shelter with pipeline receipt connection, a new fuel transfer line, and modern pumping and filtration equipment to ensure safe and reliable transfer capabilities to the operating systems.


2013          

Additive Injection Facility

Additive Injection Facility
Minneapolis St. Paul ARS, Minnesota

PROJECT SCOPE:
Design and construct an addition to an existing pumphouse to house a new fuel additive injector system

DESIGN SCOPE: Lead electrical engineer responsible for electrical design, CADD and specifications of power distribution single lines, riser diagrams, panelboard schedules, wire and conduit schedule, power plans and lighting.


2012           

Naval Amphibious Base Coronado

Naval Amphibious Base Coronado
3rd St & Alameda Blvd
San Diego, CA 92118



PROJECT SCOPE:
Perform site investigations, interviews with site personnel, assessment of current facility condition, clarification of current deficiencies and identification of new deficiencies with necessary repairs.

ELECTRICAL DESIGN SCOPE:
Lead electrical engineer responsible for electrical design, CADD and specifications of power distribution single lines, riser diagrams, panelboard schedules, wire and conduit schedule, power plans.

2012           

Hydrant Fuel System

Hydrant Fuel System       
Iwakuni, Japan


PROJECT SCOPE:
Construct a new Type III Hydrant Fueling System including 5 hydrant pits, two 10,000 BBL above ground tanks with aluminum honeycomb floating pans, a pumphouse with control room, a covered two-bay truck fill and offload facility, an emergency generator, and associated support facilities. 

ELECTRICAL DESIGN SCOPE
: Lead electrical engineer responsible for electrical design, CADD and specifications of power distribution single lines, riser diagrams, panelboard schedules, wire and conduit schedule, power plans, lighting plans, grounding and lightning protection, telecommunication plan, and fire alarm system.

2011             

Hunter Army Air Field Emergency Off-Load

Hunter Army Air Field Emergency Off-Load
171 Haley Avenue
Hunter Army Airfield, GA 31409


PROJECT SCOPE
: Design and construct a shelter, two (2) position truck offloading facility with spill containment.

ELECTRICAL DESIGN SCOPE
: Lead electrical engineer responsible for electrical design, CADD and specifications of power distribution single lines, riser diagrams, panelboard schedules, wire and conduit schedule, power plans, lighting plans, grounding and lightning protection, telecommunication plan, plc controls diagram and EFSO/fire alarm system and fuel system controls.




2011             

Barksdale Air Force Base 

Barksdale Air Force Base, Louisiana

PROJECT SCOPE:Replace pumphouse

ELECTRICAL DESIGN SCOPE:  A new Type III pump shelter with bridge crane and hoist, five (5) 600 GPM fuel pumps and filter separators, product recovery system, surge suppressors, HHT check out station, 8 inch and 16 inch tie-ins to existing hydrant system, control system, motor control and programmable logic controls center, manual transfer switchgear for existing generator, utilities, demolition of existing pump shelter and support structures, site improvements and other necessary infrastructure.



2011             

Design Electrical System and Refueler Parking

Design Electrical System and Refueler Parking
Martin State ANG, Baltimore, MD

PROJECT SCOPE: Replace components and/or electrical system, modify refueler (R-11) parking area

ELECTRICAL DESIGN SCOPE: Replace components and/or electrical system to improve operation of the electrical control system for fuel operations
–    Existing General Electric Series 8000 Motor Control Center
–    Method to ensure electronics within Electrical Control Building 3036 are impervious to water intrusion and associated degradation
Modify refueler (R-11) parking area
–    Replace asphalt surface with concrete parking pad
–    Spill containment capable of holding 110% of single refueler (R-11)
–    Tie-in drainage system to existing oil/water separator



2007              

Confederate Avenue Building No. 13

935 E. Confederate Avenue
Atlanta, GA 30316

PROJECT SCOPE: Minor building modifications. Standby emergency generator and automatic transfer switch

ELECTRICAL DESIGN SCOPE: Lead electrical engineer responsible for electrical design, CADD and specifications of power distribution single lines, riser diagrams, panelboard schedules, wire and conduit schedule, power plans and lighting

2007

Oglethorpe Armory 

5019 GA HWY 42
Ellenwood, GA 30294

PROJECT SCOPE: Standby emergency generator and automatic transfer switch

ELECTRICAL DESIGN SCOPE: Lead electrical engineer responsible for electrical design, CADD and specifications of power distribution single lines, riser diagrams, panelboard schedules, wire and conduit schedule, power plans
Project Manager responsible for scheduling client relationships

2007

Tifton Armory Building Renovation

3111 US Highway 41 S
Tifton, GA 31794

PROJECT SCOPE: Completed interior renovation of an armory building

ELECTRICAL DESIGN SCOPE: Lead electrical engineer responsible for electrical design, CADD and specifications of power distribution single lines, riser diagrams, panelboard schedules, wire and conduit schedule, power plans, lighting plans, grounding and lightning protection, telecommunication plan, and fire alarm system
Main Power Feed: 600A, 120/208V, 3Φ, 4w feed